It’s quite difficult to make out but this is the main floor pan marked out and drilled. As sad as it sounds I quite enjoyed doing this bit, what I didn’t like was the bad back I had for nearly a week, this is part of the blood sweat and tears!!!!
Posts Tagged as ‘kit’
September 23, 2007
More Rivetting
OK at this stage the two sides the front panel on the n/s and the front bulkhead panel are now bonded and riveted solid . The chassis is now upside down and ready for the floor pan !!!! its nearly a car?
September 23, 2007
prep work
As you can see from the picture above the first panel has been preped and is ready for fitment. The tape is there to protect the powder coating on the chassis.





